3x3m Booth Kit with S-Curve Wall & Sloped Arch, Counter & TV
3x3m Booth Kit with S-Curve Wall & Sloped Arch, Counter & TV
3x3m Booth Kit with S-Curve Wall & Sloped Arch, Counter & TV
3x3m Booth Kit with S-Curve Wall & Sloped Arch, Counter & TV
3x3m Booth Kit with S-Curve Wall & Sloped Arch, Counter & TV
3x3m Booth Kit with S-Curve Wall & Sloped Arch, Counter & TV
3x3m Booth Kit with S-Curve Wall & Sloped Arch, Counter & TV

3x3m Booth Kit with S-Curve Wall & Sloped Arch, Counter & TV

£960.00
SKU: EXHIBIT-10X10-11 Free Delivery

Step 1: Select frame Size

Choose Default Size

Need Custom Size?

Don't see your size?

Request Custom Size Quote

Our experts will get back to you within 2 hours

When is your event?

Help us prioritize your order

Shipping deadlines: Order today to secure delivery on November 19th

Step 2: Upload Artwork & Checkout

Upload your designs now or you can upload later

Upload Your Artwork

Upload your design file, share a link, or email it later.

Need Design Help?

Get a free 2D mockup preview of your design before ordering.

Request free 2D design preview

We'll send your mockup preview within 24 hours

£960.00

How to order your backdrop

01

Choose Product

Select your product, size, and add-ons that best match your needs.

02

Upload Design

Upload your artwork or request design assistance before placing your order.

03

Review Proof

Complete checkout, receive a proof, and approve the final artwork.

04

Print & Deliver

We print your approved order and ship it directly to your doorstep.

Product Specs

3x3m Booth Kit with S-Curve Wall & Sloped Arch, Counter & TV

Every little thing designed is magic.
Portable Exhibit Display for 3m Wide Booths puts your brand under the spotlight! This fully personalized, interactive display will catch the eye of anyone walking by. Thanks to its Custom Printed banner which creates a distinctive dimension to the exhibit, it's finally possible to really give the exhibit that touch of personality you always wanted. Make your brand stand out and make this innovative product your next display.

Highlights:

  • 100% pure polyester fabric - 260 gsm
  • Wrinkle-resistant tension fabric with zip lock at the bottom
  • Fire Retardant & Machine washable fabric
  • Tool-free effortless assembly
  • Single or Double-Side graphics can be printed
  • Lightweight and portable
  • Dye sublimation print with CMYK
  • The replacement banner is available at a low cost to replace with new artwork/design.

    Product Specifications:

    Hardware: Aluminum Bungee-corded frames with two wide steel bases
    Graphic: Polyester fabric 260gsm
    Print Method: Dye Sublimation CMYK printing
    Carry Case: Nylon Carry Bag

    Production & Delivery:

    • Our production time on this product is 48hrs and for delivery 4-5 days. However, if you need it quickly please contact us
    • The replacement banner will be dispatched within 48hrs.
    • Frames will be dispatched within 24hrs.
    Warranty:

    This product comes with a standard 2-years warranty against Aluminum Frame for manufacturing defects. This warranty does not cover damages caused by accidents, abuse, or regular wear and tear. If the product is found to be defective, it will be repaired or replaced by Backdropsource.
    The final decision of replacement will be at the discretion of Backdropsource.

      FABRIC CARE
      All of Backdrop Source's banners are wrinkle-resistant and machine-washable. Our fabrics stay fade-free over many washes. Easily foldable and portable, your curved fabric banner will resist crumpling or wrinkling over many commutes and road trips.

      Kit Includes : 

      • 1 x Portable Exhibit Display - S shape - 1m W x 2.7m H
      • 1 x Portable Exhibit Display ( Rampant ) - 2m W x 2.5m H
      • 1 x Rectangle Counter - 0.8m W x 1m H x 0.5m D
      • 3 x Graphic prints with cotton bags
      • 1 x Shelf stand - 28cm W x 50cm L x 100cm H - can hold upto 15kgs.
      • 1 x TV Mount - supports upto 32 inches - 1.8m high from bottom.
      • 1 x Clamping LED lights
      • Soft Nylon Carry Bags

      Optional Accessories:

      Frame size can be customized as per your requirement. Contact us

      Portable Exhibit Display - S shape - 1m Wide x 2.7m Height
      Frame dimension : 1m wide x 2.7m height
      Graphic Dimension : 1000mm wide x 2580mm height
      Package Dimension : 27cm x 27cm x 74cm

      Portable Exhibit Display ( Rampant ) - 2m Wide x 2.5m Height
      Frame dimension : 2m wide x 2.3m/2.5m height
      Graphic Dimension : 2000mm wide x 2280mm/2524mm height
      Package Dimension : 65cm x 35cm x 10cm *1pcs

      Rectangle Counter - 0.8m Wide x 1m Height x 0.5m Depth
      Frame Dimensions : 0.8m Wide x 1m Height x 0.5m Depth
      Graphics Dimension : 2200mm width x 1025mm height
      Package Dimension : 84cm x 12cm x 58cm

      LED Light with Light Holder
      Material : Aluminum, LED Bulbs
      Adapter : 12V / 1.5A / 3.5m Wire
      Power : 5W, 700LM

      Total Weight : 35kgs

      Just in case, you want to give us your own designs, we accept them when it meets the following specifications:

      • File Formats: .eps, .png, .jpg, .bmp, .gif, .psd, .cdr, .pdf, .tif, .tiff, .ppt,.ai
      • Artwork: Any size of your choice
      • Font format: No bleed, no crop marks, only outlines fonts
      • File: If Photoshop, please provide a flattened file only
      • Resolution: 150 dpi resolution at 100% of the final print size
      • File Size:  For uploading via the website, please ensure that the file size remains below 50 MB. If the file size exceeds 50 MB, kindly utilize file-sharing systems such as WeTransfer, Dropbox, Google Drive, etc to upload the file and share the URL with us.
      We also offer free design services. Feel free to email us your designs or thoughts, and we will be happy to replicate them for you. You can reach us ID: shopemail

      Product Dimensions

      Available dimensions vary by selected product option.

      What's included

      Includes printed fabric graphic, portable frame hardware, and carry storage components where applicable.

      Artwork and file setup

      Upload print-ready artwork in common production formats or request design help before checkout.

      Related Products

      Customer Reviews

      Based on 5 reviews
      60%
      (3)
      40%
      (2)
      0%
      (0)
      0%
      (0)
      0%
      (0)
      F
      Fan Systems Group Ltd
      Amazing Service

      The level of service was 5 star. Very quick responses with initial help and then super quick to turn around the order. Qualtiy of goods is excellent. Great Value!

      M
      Miles Bradford
      Complete Package

      Counter, screen mount, lighting—everything’s in the box ready.

      B
      Beatrice Winfield
      Vibrant Visuals

      The vibrant prints looked sharp and stayed crisp, wash after wash.

      J
      Jasper Marlowe
      Light Yet Steady

      Surprisingly sturdy yet easy to carry—modern and mobile.

      P
      Poppy Ellison
      Setup Made Simple

      A breeze to assemble—set up was straightforward and intuitive.

      Frequently Asked Questions